1.
DISASSEMBLY ON SEATED VEHICLE
INTERIOR
2.
DISASSEMBLY ON A SEATED CAR
UNDER
3.
DRILLING OF PRE-DRILLED HOLES
HOLE IN FLOOR
4.
CUSTOMIZATION STEPS
- 00.24 - INLAY FLOOR
- 00.38 - INSERTION OF BASE PLATES
5.
INSTALLATION OF JANY RAIL
IMPORTANT - ALL GLUE IN GLUE TUBES MUST BE USED IN THE INSTALLATION:
- 2.45 M - 3 GLUE SAUSAGES ARE EMPTIED
- 1.6 M - 2 GLUE SAUSAGES ARE EMPTIED
- 90 CM - 1 GLUE SAUSAGE IS EMPTIED