1. 

DISASSEMBLY ON SEATED VEHICLE
INTERIOR

2. 

DISASSEMBLY ON A SEATED CAR
UNDER

 

3. 

DRILLING OF PRE-DRILLED HOLES 

HOLE IN FLOOR

4. 

CUSTOMIZATION STEPS

  • 00.24 - INLAY FLOOR
  • 00.38 - INSERTION OF BASE PLATES

5.

INSTALLATION OF JANY RAIL

IMPORTANT - ALL GLUE IN GLUE TUBES MUST BE USED IN THE INSTALLATION: 

  • 2.45 M - 3 GLUE SAUSAGES ARE EMPTIED
  • 1.6 M - 2 GLUE SAUSAGES ARE EMPTIED
  • 90 CM - 1 GLUE SAUSAGE IS EMPTIED

6.

PLACEMENT OF ELEVATOR

7.

POWER TO ELEVATOR